Search results

From #openttdcoop wiki

Jump to: navigation, search

Page title matches

  • ..... for slow traffic. As a train in the presignal area will block the whole presignal block, other trains have to wait at the beginning, even if there are a lot [[Image:Blocking the presignal area.png]]
    3 KB (573 words) - 10:56, 4 December 2013
  • ...ork best with trains of various speeds, also a version with 2 entrances to presignal block would be even more efficient. ewanm89 ...ain that will take up that platform. The second train was admitted to the presignal block, even though there are no platforms for it to use. This could block
    3 KB (552 words) - 09:02, 7 November 2013

Page text matches

  • |imagedescription=A PreSignal Bypass station.}}
    4 KB (498 words) - 22:35, 9 May 2013
  • ...in the example screenshots. Also, we may want to add a discussion of prio/bypass lengths given a train length. — [[User:Strstrep|strstrep]] 20:27, 29 * yeah, pictures are bad, wrong presignal and the penalty station could also placed on better place --[[User:Ammler|A
    356 B (52 words) - 08:20, 31 July 2007
  • #REDIRECT [[Presignal Bypass Station]]
    38 B (4 words) - 13:45, 2 September 2007
  • ...ork best with trains of various speeds, also a version with 2 entrances to presignal block would be even more efficient. ewanm89 ...ain that will take up that platform. The second train was admitted to the presignal block, even though there are no platforms for it to use. This could block
    3 KB (552 words) - 09:02, 7 November 2013
  • ...ctly into the gaps on the first track. This is done entirely by the use of presignal logics, and it is quite simple to achieve. This construction is often calle It is possible to add a bypass to let the trains at (A) tun contineously when the queue at (B) is empty. (
    5 KB (902 words) - 14:29, 15 July 2009
  • ; [[Presignal Bypass Station]]
    5 KB (567 words) - 21:16, 14 July 2008
  • ...ease rename "Ballenced Pre-signal Bypass Entry.png" to "Balanced Presignal Bypass Station.png". The junctionary entry may also require this spelling correct
    389 B (52 words) - 13:35, 14 August 2008
  • ==Pre-signal bypass station== *[[Presignal Bypass Station]]
    9 KB (1,562 words) - 04:34, 30 January 2014
  • ...tiles after the entry switch signal, this would prevent trains from using bypass for any other reasons than passing stuck train. ...size and delaying the second train). Second advantage is that you can make bypass at least 1 tile smaller (possible to make it 2 tiles shorter). Sad, that so
    22 KB (3,721 words) - 17:51, 28 November 2012
  • ...:Ballenced Pre-signal Bypass Entry.png|center|140px|]]||Balanced Presignal Bypass Station|thomashauk|A combination of the two above, the diagonal lines in av
    4 KB (499 words) - 00:31, 16 February 2012
  • ...|A pickup station with quite an advanced overflow. NO, it is not presignal bypass! This combo signal arrays always checks if there is a train going to a plat
    2 KB (286 words) - 00:46, 16 February 2012
Powered by MediaWiki