Difference between revisions of "LBR Mainlines"

From #openttdcoop wiki

Jump to: navigation, search
m
Line 7: Line 7:
 
'''Current stage: ''' Development - Building first live test track
 
'''Current stage: ''' Development - Building first live test track
  
'''Notes:''' Takes up less track than an LL_RR mainline and can be compressed more, downgrades to LR more easily where needed, more complex signalling
+
'''Pros:'''  
 +
* Takes up less track than an LL_RR mainline and can be compressed more
 +
* Downgrades to LR more easily where needed
 +
* Allows both over and undertaking
  
'''Minimum width:'' 5 tiles: Primarily (L__B__R), Connectors (L_L_R_R)
+
'''Cons:'''
 +
* More complex signalling
 +
* Lower capacity than LL_RR
 +
* Junction positions are restricted
 +
 
 +
'''Minimum width:''' 5 tiles: Primarily (L__B__R), Connectors (L_L_R_R)
  
 
[[Category:R&D]]
 
[[Category:R&D]]

Revision as of 13:04, 27 July 2006

by OwenS

LBR Mainlines are arranged in a 3x1 configuration, of:

Left | Bidirectional | Right

Current stage: Development - Building first live test track

Pros:

  • Takes up less track than an LL_RR mainline and can be compressed more
  • Downgrades to LR more easily where needed
  • Allows both over and undertaking

Cons:

  • More complex signalling
  • Lower capacity than LL_RR
  • Junction positions are restricted

Minimum width: 5 tiles: Primarily (L__B__R), Connectors (L_L_R_R)

Powered by MediaWiki