LBR Mainlines
From #openttdcoop wiki
by OwenS
LBR Mainlines are arranged in a 3x1 configuration, of:
Left | Bidirectional | Right
Current stage: Development - Building first live test track
Pros:
- Takes up less track than an LL_RR mainline and can be compressed more
- Downgrades to LR more easily where needed
- Allows both over and undertaking
Cons:
- More complex signalling
- Lower capacity than LL_RR
- Junction positions are restricted
Minimum width: 5 tiles: Primarily (L__B__R), Connectors (L_L_R_R)