Difference between revisions of "BaseCosts NewGRF"

From #openttdcoop wiki

Jump to: navigation, search
(Info: new links)
(Examples: v5)
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
== Info ==
 
== Info ==
 
Setting the costs by using the id from
 
Setting the costs by using the id from
[http://wiki.ttdpatch.net/tiki-index.php?page=BaseCosts BaseCosts Table]
+
[http://newgrf-specs.tt-wiki.net/wiki/BaseCosts BaseCosts Table]
 
and the value n of the following formula:
 
and the value n of the following formula:
  
Line 9: Line 9:
 
'''<base cost no> <exponent of multiplicator><br>'''
 
'''<base cost no> <exponent of multiplicator><br>'''
 
where<br>
 
where<br>
'''<base cost no>'''  is an entry from the first column of the  [http://wiki.ttdpatch.net/tiki-index.php?page=BaseCosts base cost list] <br>
+
'''<base cost no>'''  is an entry from the first column of the  [http://newgrf-specs.tt-wiki.net/wiki/BaseCosts base cost list] <br>
 
and <br>
 
and <br>
 
'''<exponent of multiplicator>''' is the n in the multiplicator to the original base costs: 2^(n-8) Thus a value of 8 will leave the costs unchanged, a value of 9 will double it, 10 will quadruple it and 7 will half it.
 
'''<exponent of multiplicator>''' is the n in the multiplicator to the original base costs: 2^(n-8) Thus a value of 8 will leave the costs unchanged, a value of 9 will double it, 10 will quadruple it and 7 will half it.
Line 38: Line 38:
  
 
[[File:Basecosts-presets.png]]
 
[[File:Basecosts-presets.png]]
 +
 +
New version 5: one parameter per cost:
 +
 +
[[File:Basecosts5.png]]
  
 
----
 
----

Latest revision as of 07:45, 12 October 2012

Info

Setting the costs by using the id from BaseCosts Table and the value n of the following formula:

Using math: NewBaseCost = OldBaseCost * 2^(n-8), where n is the value of property 08.

You can only rise base costs by factors which correspond a power of 2. The general way to set parameters are in pairs of two:
<base cost no> <exponent of multiplicator>
where
<base cost no> is an entry from the first column of the base cost list
and
<exponent of multiplicator> is the n in the multiplicator to the original base costs: 2^(n-8) Thus a value of 8 will leave the costs unchanged, a value of 9 will double it, 10 will quadruple it and 7 will half it.

Download from BaNaNaS or from the DevZone (Report Bugs to our tracker.)

Discussion: http://www.tt-forums.net/viewtopic.php?t=46720

Presets

the presets GRF has at least 4 sets saved. (Homepage)

Table: http://dev.openttdcoop.org/projects/basecosts-presets/repository/changes/BaseCostsTable.ods

Please suggest new presets to the tracker.

Examples

config for raise Terraform (x16), but keep foundations on default:

BaseCostsModExampleTF.png

using Pikka's pb_build but modify foundations:

BaseCostsModExamplePikka.png

using my Presets GRF followd by base costs mod

Basecosts-presets.png

New version 5: one parameter per cost:

Basecosts5.png


other similar grfs are:

- Pikka's "Modified Building Costs" (doesn't respect the new OpenTTD feature which splits terraform and foundations)

- Terkhen's "Raise landscaping costs"

- my old grfs: BaseCosts Mod 2 and Airmod

Powered by MediaWiki
  • This page was last modified on 12 October 2012, at 07:45.