Mainline integrated stations

From #openttdcoop wiki

Revision as of 21:10, 1 July 2007 by Kul (Talk | contribs)

Jump to: navigation, search

by Kul

Overview

The Stations

LL_RR 2*7 Platform

by Kul

The joiner concept
The current implementation in the network

It was originally meant as a joiner right after a BackBone Hub and infront of a principle station, this makes it use quite limited, except from using it at a SideLine Hub in one-way networks. You can see the use of bouncers (the "BOUNCE" sign), this is because trains from the line the bouncers are in wanted to take the route with the bouncers, but that caused a high load on the western lanes and it jammed from time to time.

Pros:

Cons:



Progress

<General Idea>
Idea Player Draft of idea Testing Completed Remarks
A drive-through station Kul Sorting priorities No results yet -