Difference between revisions of "Enhanced SBahn"
From #openttdcoop wiki
m |
m |
||
Line 11: | Line 11: | ||
* [[User:Kaze|Kaze]] came up with the idea to enhance the Sbahns into two directions: one clockwise, another one counterclockwise. | * [[User:Kaze|Kaze]] came up with the idea to enhance the Sbahns into two directions: one clockwise, another one counterclockwise. | ||
* [[User:Mucht|Mucht]] suggest to enhance the inner Sbahn to 4-tile trains. Also, the stations should have 4 platforms - 2 for each direction. | * [[User:Mucht|Mucht]] suggest to enhance the inner Sbahn to 4-tile trains. Also, the stations should have 4 platforms - 2 for each direction. | ||
+ | |||
+ | [[Catgegory:R&D]] |
Revision as of 12:58, 27 July 2006
by Mucht
It has shown that many SBahn trains of the inner SBahn-ring are far beyond their capacities.
Think about a ring consisting of 4 stations: the ICE station where passengers are transfered to and three stations where passengers are picked up. The current SBahn serves the stations in one direction. Several problems show up:
- the last station before the ICE station is weakly served because most trains going there are already fully loaded.
- with a huge amount of waiting passenger the station-time of a train increases dramatically (and the track usage is comparatively low). Therefore, many trains have to wait on the track and can't enter a station.
Todo: