Search results

From #openttdcoop wiki

Jump to: navigation, search

Page title matches

Page text matches

  • : [[Junctionary - BBHs|BBH]] • [[Junctionary - SLHs|SLH]] • [[Junctionary - Stations|Stations]] • [[Junctionary_-_Mer
    5 KB (618 words) - 07:15, 22 November 2013
  • =SLHs=
    382 B (47 words) - 13:17, 29 September 2011
  • ...ducing some very uneven mainlines that couldn't be properly connected with SLHs. In the end, some major rebuilds were required for the north-western statio
    8 KB (1,179 words) - 22:18, 9 May 2013
  • ...tly confined network nestled in the valleys with a total of 10 BBHs and 11 SLHs
    7 KB (1,017 words) - 22:11, 9 May 2013
  • ...secondary stations in the corners, connected to the ML with 4 BBHs, and 4 SLHs for the primary industries. The network developed very well, except for one
    9 KB (1,235 words) - 22:23, 9 May 2013
  • ...ith more that 1500 trains and a 6 line CML, it has 4BBH's and intermediate SLHs at regual pacing. The game ended at about 85% completions, as we had a few
    6 KB (913 words) - 07:17, 7 November 2013
  • 4 KB (625 words) - 10:26, 14 April 2013
  • : [[Junctionary - BBHs|Backbone Hub]] • [[Junctionary - SLHs|Sideline Hub]] • [[Junctionary - Stations|Stations]] • [[Junction
    5 KB (641 words) - 01:48, 22 January 2024
  • ...r without ability to join every ML rail. You can find those SLHs under Old SLHs and the proper rest can be found in the New SLH group.
    662 B (128 words) - 12:36, 29 September 2011
  • ...ean you only have to connect it to the northbound mainline; there could be SLHs on the mainlines between BBH04 and the drops that want to go south.
    5 KB (942 words) - 08:35, 4 December 2013
  • ...d like a LLLL_RRRR ring all around the map with no BBHs, 4MSHs and several SLHs. Wood got a majority on the map and paper mill production ended at about 18
    12 KB (1,749 words) - 22:10, 9 May 2013
  • ...ramps and putting an extra switcher before current switcher-merger for all SLHs. The merger is not touched and the upgrade can be easily done on the fly wi
    22 KB (3,721 words) - 17:51, 28 November 2012
  • ...ding practice". The plan itself had quite a few hubs, and with addition of SLHs, we ended up on quite a nice count so the hubs are basically everywhere on
    10 KB (1,471 words) - 22:10, 9 May 2013
  • ...like one large ring, split up into three branches, which enabled us build SLHs everywhere. In the end, we had 2000 trains entering the main stations in 12
    11 KB (1,641 words) - 22:08, 9 May 2013
  • Three-way BackBone Hubs are the most common form of hubs after SLHs in general. The most interesting part of a BBH is usually the merger, which
    473 B (80 words) - 10:00, 23 March 2011
  • #REDIRECT [[Junctionary - New SLHs]]
    36 B (5 words) - 12:07, 29 September 2011
  • #REDIRECT [[Junctionary - Old SLHs]]
    36 B (5 words) - 12:07, 29 September 2011
  • ...bitious plan with 12 BBHs, 12 MSHs and 12 main stations was chosen, add 13 SLHs and 2000 trains and you got a game bordering to insanity even by openttdcoo
    9 KB (1,286 words) - 22:07, 9 May 2013
  • |imagedescription=One of the SLHs in the network}}
    7 KB (1,066 words) - 11:18, 24 November 2013
  • ...h train length of 2. A common network plan was set up, with many BBHs' and SLHs'. At the point of finalizing, the main line had up to 4-5 lines at some poi
    9 KB (1,355 words) - 21:53, 9 May 2013

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Powered by MediaWiki